Answer “should we build here?” with a real map — not a guess
Before you pull permits or order cable, your team needs a clear picture of the service area. MapItRight lets pre-construction planners open a project on Google Maps, organize early plant thinking, and carry that work into full design if the build moves forward.
Why feasibility studies take longer than they need to
The analysis is spread across too many tools
Homes passed in one spreadsheet, rough routes in Google Earth, costs in another file, and the final answer in a slide deck. By the time the deck is done, the assumptions are already outdated.
Scenarios are hard to compare
Underground vs aerial, different density assumptions, or a smaller BEAD-eligible footprint each become a separate workbook maintained by a different person. Comparing them becomes a meeting, not a click.
Feasibility does not survive into design
The model that justified the build often lives in a standalone Excel file. When the project enters design, the team starts over — and the numbers change without a clear audit trail.
How feasibility work flows in MapItRight
Map, organize, decide.
Open a project for the candidate area
Create a project on Google Maps for the parcel, neighborhood, or county you are evaluating. Keep early planning plant in Planned state so it stays separate from live inventory.
Map the area and sketch early plant
Place key locations, rough cable paths, and reference overlays so the team can see the geography and plant context together — not as disconnected notes.
Carry the project into full design
If the build gets approved, the same project becomes the design record. No rebuild, no second map, no lost assumptions between feasibility and execution.
What pre-construction teams get
Google Maps project canvas
See roads, parcels, and geographic context while you evaluate a build area.
GIS overlay support
Layer reference data for boundaries, parcels, and custom context during early planning.
Planned design state
Keep feasibility and design work separate from live operational plant.
Early plant modeling
Place locations and cables so the team shares one spatial picture of the opportunity.
Exportable project data
Export GeoJSON or KML when stakeholders need a shareable spatial record.
Feasibility-to-design continuity
Move from “should we build?” to full design on the same project map.
“We tried a few tools before MapItRight. It felt easier for our team and the pricing was actually affordable.”
Related solutions
Frequently asked.
before you commit to construction.
Ready to see fiber feasibility studies in action?
30-minute demo. No slideware. We'll walk through your network, not ours.

