MapItRight
Solution · BEAD Compliance

Document BEAD builds on the map you operate from

Sub-grantee reporting depends on per-location records, construction evidence, and a plant map that matches what was built. MapItRight helps teams document funded locations, capture field photos and updates, track Planned to Active buildout, and export structured project data for state reporting workflows.

app.mapitright.com/solutions/bead-compliance
The problem

Why BEAD documentation breaks down in the field

Reporting data is rebuilt from disconnected sources

Sub-grantee filings ask for per-location build status, activation timing, and supporting evidence. When that information lives in spreadsheets, email threads, and photo folders, every reporting cycle starts as manual reconstruction.

Construction evidence is hard to tie to locations

Auditors and state program offices expect proof that funded locations were actually reached. Photos and notes that are not linked to map locations create rework when submissions are reviewed or questioned.

Operational maps rarely reflect grant milestones

Teams may know which locations are committed, under construction, or activated, but that status is not reflected on the plant map. Without a shared record, engineering, construction, and compliance work from different versions of the truth.

How it works

How BEAD compliance documentation works in MapItRight

Locate, document, activate, export.

STEP 01

Model funded locations on the project map

Create a project for your BEAD service area and place locations, drops, and plant on Google Maps. Keep buildout inventory in Planned state while design and construction progress so funded locations stay visible in spatial context.

STEP 02

Capture field evidence during construction

Field crews attach photos and video, drop marker flags, and update plant from a mobile browser while builds progress. Evidence stays linked to the map locations and assets it describes instead of living in separate file shares.

STEP 03

Activate plant and export reporting data

Move completed locations and plant from Planned to Active as service goes live. Export GeoJSON, KML, or BOM reports from the same project map when your compliance team prepares sub-grantee submissions for your state program office.

Capabilities

What BEAD sub-grantees get in MapItRight

Per-location plant records

Maintain spatial records for funded locations, drops, and connecting plant on one project map.

Field evidence on assets

Attach photos, video, and marker flags to locations and plant elements during construction and activation.

Planned and Active tracking

Separate design and buildout plant from live inventory as funded locations come online.

Construction Staking Sheets

Generate customized field PDFs from project data for crews building BEAD-funded areas.

Audit trails on changes

Review who updated plant records and when as build status changes over the life of the grant.

Exportable project data

Export GeoJSON, KML, and BOM reports for downstream formatting into state or program submission requirements.

We tried a few tools before MapItRight. It felt easier for our team and the pricing was actually affordable.
TM
Tim M.
Operations · CC Communication
FAQ

Frequently asked.

BEAD compliance software helps sub-grantees document federally funded broadband deployment: which locations were built, what plant serves them, what evidence supports construction, and how inventory changed over time. MapItRight supports that documentation on a fiber-native project map rather than in disconnected spreadsheets.

Ready to see bead compliance in action?

30-minute demo. No slideware. We'll walk through your network, not ours.